Pierce College

Pierce College

The intent of this project was to correct the construction deficiencies of the previously built structure, Center for the Science Building at Pierce College. This project consisted of verifying existing conditions and to visually compare the existing conditions at the project location, within immediate area of work only with the existing construction documents. Once James Heimler, Architect, Inc. (JHAI) verified the issues that were present at the project location, JHAI conferred with its consultants and responded with its recommendations to the Owner. Corrections were made to the construction documents that addressed the issues raised. A schematic design was given and Design Development / Construction Documents were implemented. With the coordination of the owner and LACCD project manager a DSA filing is yet to be made. The project will be carried out with the DSA, Bid Coordination and Construction Administration / Structural Observation services.

Legal

The content of this website is provided for information purposes only. While every effort is made to ensure that the information contained within the website is accurate and up to date, JHAI makes no warranty, representation or undertaking whether expressed or implied, nor does it assume any legal liability, whether direct or indirect, or responsibility for the accuracy, completeness, or usefulness of any information.

All materials, unless otherwise stated, are copyright and remain the property of JHAI.